Scroll to top
© 2023 , TRIA, S.A.
Share
en pt
Back
SHOWS AND PUBLIC MEETINGS

Coimbra Culture and Congresses – Convent of São Francisco

  • LOCATION:

    Santa Clara, Coimbra - Portugal

  • IMPLEMENTATION DATE:

    2015

  • CLIENT:

    MRG ENGINEERING & SOLUTIONS VEIGA LOPES, SA Climacer - Climatização do Centro, Lda Ferreira - Construção, S.A.

  • ARCHITECTURE:

    Carrilho da Graça Arquitectos

Scroll

Project Info

Objectives

Ensure compliance with the legal requirements of fire safety, regarding fire-resistant compartmentation, in harmony with architectural, engineering and/or interior design projects.

Solution Implementation

Fire resistant doors; Automatic curtains for fire compartmentation and for smoke control; TRIA Dossolan; Fire seals.

Developed Activity

Preparation and verification of the wall openings for the installation of fire-resistant doors and fire curtains, in compliance with the previously established objectives.

01.

Project Support

Support to architecture and engineering in the definition of the most appropriate solutions to fit the specifics of the project.

02.

Analysis & Proposal

Specifications deep analysis and best-fit solutions presentation in a technical-commercial proposal with fundament on the requirements of the project.

03.

Implementation

After adjudication, an assessment of the real conditions on site is done and the preparation process is initiated, allowing the adjustment of the defined solutions and proceeding with implementation.